Microsoft
Leopardstown, Dublin, Ireland
- Cemento Lightweight
- Wall Panelling
- 1300m2
- CIL02, smooth, FR/MDF
Our team collaborated closely with local architects and Gensler’s London office to deliver two atria for Microsoft’s striking new European headquarters. Cemento was responsible for designing, fabricating, and installing all fascia panels—including their returns—using lightweight wall panelling. Each panel, precisely manufactured to fit its specific location, was installed at height above a floor filled with an array of monitor screens. Completed in early 2018, the project took eight months to finish.
Get started with us
Cadwalader, Wickersham & Toft
Level 17, 100 Bishopsgate, EC2N 4AG
- Cast
- Lightweight
- Cast - 11.49 m2 worktop
- Lightweight Reception feature wall panels 29m2
- CIL02, smooth, FR/MDF
Savile Row – Cerberus
5 Savile Row, London
- Cast
- Lightweight
- Wall Panelling
- Cemento Cast
- - Worktops
- Cemento Lightweight
- - Wall Panelling
- - 220m2
- - CIL04, smooth, FR/MDF
Hyde Park Hayes
Millington Road, London
- Lightweight
- Staircase
- Wall Panelling
- Cemento Lightweight
- Wall Panelling
One London Wall
London
- Lightweight
- Wall Panelling
- Cemento Lightweight
- Wall Panelling